Showing posts with label schedule. Show all posts
September 2, 2015
Dear Data Two | Week 14: Productivity
calendar
,
Dear Data Two
,
dot plot
,
dual axis
,
events
,
fitbit
,
gantt
,
Moves
,
productivity
,
schedule
,
sunrise
2 comments
Nearly caught up on the weeks I had to skip. Week 14 was pretty straight forward, but I wanted my gantt chart to look a bit fancier so I put dots on the ends. For this type of lollipop Gantt chart, you need to use both axes. I'll show how to do this for Tableau Tip Tuesday next week.
To collect the data for this week, I combined data from Moves (for places and times), Fitbit (for sleeping) and Sunrise (for my calendar). I entered everything manually into Excel and connected it to Tableau.
To collect the data for this week, I combined data from Moves (for places and times), Fitbit (for sleeping) and Sunrise (for my calendar). I entered everything manually into Excel and connected it to Tableau.
Subscribe to:
Posts
(
Atom
)
